4.19 Power Distribution Allocation List

For display in the Power Distribution allocation list, in addition to the KV-active flag in the equipment data form, the presence of a Motor at the circuit is required.

Data Source

Motor data is automatically displayed from the Motor function.

Access Rights

The fields of the Power Distribution allocation list can be maintained by different users depending on access rights.

Activate Inspections

The activation of Power Distribution inspections as well as the definition of inspection cycles is done in the Power Distribution allocation list on the right side.

After saving a record, the inspection date can be changed later if necessary.

Individual Print

  1. Mark individual records (left record pointer)
  2. Right-click → Copy
  3. Trigger print via the form button „Print“

← 4.18 Power Distribution Output List | 4.20 Commissioning →

Zuletzt geändert: on 2026/01/30 at 01:11 AM