4.5 Monitoring Evidence Inspection Objects

The Inspection Objects function is divided into several areas:

BGV-A2

With BGV-A2, independent inspection objects are:

  • activated
  • subjected to a defined inspection time
  • transferred to the Inspection History monitoring
With the Inspection History button, you can switch to the inspection system.

Grounding and Potential Equalization

In addition to detailed inspection, visual inspections can be activated and subjected to inspection tracking.

Prerequisite is the setup of a Measuring Point with identifier R in the EzA/S list and in the Safety Review (Example: B-R 99611).

On the back page of the Monitoring Evidence, the Grounding points can be assigned.

Fixed Electrical Systems (Lighting)

Procedure:

  1. Set up Ex zones with „Set up explosive zones and inspection times“:
    • Select a building in the dropdown field
    • Define Ex zone by building and floor
    • For multiple Ex zones per floor, assign different zone numbers
  2. Initialize the building inspection by selecting the first inspection zones
  3. Calculate the inspection zone times
  4. Activate the individual inspection zones in the Monitoring Evidence
Background info: For „Lighting Ex“ inspection zones, all Ex zones per building must be inspected every 36 months. An inspection must be performed at least semi-annually.

Battery/Accumulator and Test Equipment

For creating a new inspection:

  1. Define a new inspection name in the dropdown field under the heading
  2. Define sequential number and inspection object name
  3. Activate and define inspection cycle

After activation, the inspection objects appear in the system Inspection History → Inspection Objects.


← 4.4 Evidence Measuring Points | 4.6 Evidence Canned motors →

Zuletzt geändert: on 2026/01/30 at 01:05 AM