Monitoring Evidence is automatically created in 3 versions:
| Version | Description | Color |
|---|---|---|
| EzA Measuring Points Major Accident | Measuring Points according to Major Accident Regulation | Red |
| EzA Measuring Points PLT | Measuring Points of PLT equipment (not Major Accident) | Green |
| Inspection Objects | General inspection objects | - |
| Canned motors | Special canned motor pumps | - |
The data of the Monitoring Evidence for EzA Measuring Points is transferred completely from the Safety Review and EzA/S list.
The checkbox „Measuring Point activated…„ starts the inspection cycle monitoring from the specified date.
For activation, the definition of an inspection cycle in the Safety Review is required. A distinction is made between:
Via the transition buttons, you can switch directly to:
← 4.3 Inspection Specification | 4.5 Monitoring Evidence Inspection Objects →